Jumbo shopping centre

Project: New building

More freely on the site

The enlarged Jumbo shopping centre was opened four months ahead of schedule thanks to the new ideas concerning frame structures, product model-based design and good cooperation between the partners.

There were many exceptional technical solutions used. For example, the steel frame, which Ruukki delivered and installed, was braced by a framework in which all the columns are bracing elements, and construction could be carried out more freely on the site.