Mälkiä canal bridge in Lappeenranta
Project: New bridge
Our delivery: 2010
- Steel structures & installation
Partners:
- Investor: Tiehallinto
- Contractor: Consortium TYL Vt6 (Lemminkäinen Oy & Kesälahden Maansiirto Oy
- Designer: SITO Oy
Crosses the Saimaa
- 315 m long bridge crosses the Saimaa canal, project has been finished in 2010
- Ruukki’s delivery included bridge superstructures and steel pipe piles fitted with rock shoes for the foundations of the bridge.
- The installation of the surface treated steel structures also included to the delivery.