Moventas Wind Turbine Factory

Project: New building

Our delivery: 2008

  • Steel frame structures
  • Sandwich panels
Cost-efficient steel structures solutions

The 19,000 m2 Moventas factory, specialising in the manufacture of wind turbine gearboxes, was built in the city of Jyväskylä, Finland.

Ruukki’s comprehensive solution, including the steel frame, load-bearing roof structures, as well as façade and partition wall elements and their installation, guaranteed undisturbed scheduling.

To ensure efficient and seamless cooperation during the project, reliable partners were chosen as suppliers.

The cost-efficient steel structure solution enabled, among other things, the flexible design and convertibility of work spaces.

Ruukki previously delivered steel frames and shell structures for the second and third phases of the Vesanka production unit that Moventas has built in Jyväskylä.