Sollentuna Centrum

Project: New building

Our delivery: 2009

  • Steel structures, fire protection
  • Load bearing sheets
  • Prefabricated concrete stair elements
  • Prefabricated concrete wall elements
  • hollow core slabs

Partners:

  • Investor: Steen & Ström
  • General contractor: NCC AB
Ruukki delivered steel structures, stabilizing prefabricated concrete wall elements for core elevator shaft / staircase, hollow core slabs and prefabricated  stair elements for shopping mall.

Total area 60 000m2 for 120 stores and 1 500 parking spaces.
Design, delivery and installation
Steel structures, fire protection
Load bearing sheets
Prefabricated concrete stair elements
Prefabricated concrete wall elements
hollow core slabs
~ 140 000 000 kr