Technopolis Ruoholahti

Project: New building

Our delivery: 2008

  • Facades
  • Steel frame
  • Foundations
A complete multi-storey solution

The technology centre at Technopolis Ruoholahti is the first-ever project which Ruukki supplied with a complete multi-storey solution, comprising a steel pile foundation base, steel frame and facades.

Structural solutions that have been industrially prefabricated to the maximum extent facilitate and optimise construction work, increase worksite safety and reduce the risks related to a construction project.

Ruukki’s overall responsibility for the installation of the foundation base, frame and facades, as well as the company’s product innovations significantly reduced the amount of time required for the construction work.