Jännevirta Bridge

Project: New bridge

Our delivery: 2018

  • Steel structures & installation

Partners:

  • Investor: Liikennevirasto
  • Contractor: Kreate Oy
  • Design: Ramboll Finland OY

Crosses the Saimaa deep-water channel

  • 560 m long composite girder bridge crosses the Saimaa water channel near by Jännevirta village, project has been finished in 2018.
  • 6th longest bridge in Finland
  • Effective width is 15,25 m (two roadways and 4 m walkway)
  • Over 7000 vechicles crossed the bridge daily, 6 % is heavy transport
  • Ruukki´s delivery included steel structures fabrication and installation

The references shown are only a small part of the projects we have done, and the most recent ones are yet to come.

Are you interested to know more, please contact us!

More references

Bridge structures

CF-4285 Dragsbron, Norrköping

Read more

Logistics

Logicenters Nurmijärvi

Read more