Kirkkonummi Town Hall

Project: New building

Our delivery: 2011

  • 400-ton steel frame

Partners:

  • Developer: Real estate company Kirkkonummen kunnantalo/ Kirkkonummi Town Hall
  • Main Contractor: Peab Oy
  • Architectural Designer: Arkkitehtitoimisto Sigge Oy
Steel frame delivery

The construction of the new Kirkkonummi Town Hall, located centrally in Kirkkonummi, will be completed in late 2011. In the design phase, attention was paid to the requirements of physically disabled visitors and other special groups, and also to current energy efficiency aspects. A pedestrian bridge will connect the building to the adjacent departments of community technology.

Ruukki delivered the steel frame for the project.