A 11-storey high modern hotel building

Nordec responsible for structural frame for 11-storey hotel in Tromsø

A 11-storey high modern hotel building
Nordec Group Oy press release 18.9.2025 08.15 UTC+3

Nordec Group has been contracted by HENT to design, manufacture and install the structural frame for the Mack Øst hotel project in Tromsø, Norway. The development includes a new 11-storey hotel in the city centre, connected to the former Mack Brewery. The brewery building will be structurally reinforced to support the new structures and enable potential future expansion. 

Nordec’s delivery covers the entire structural frame from design to installation. The scope includes structural steel components and composite columns together with concrete walls, slabs and stairs. Installation of prefabricated bathroom modules is also part of the delivery. 

Work begins with modifications to the existing brewery and continues with the erection of the new hotel structures. The central city block location requires careful planning and coordination, with limited space for logistics and parallel works inside the existing building. 

“This project combines modern construction with the challenges of integrating new structures into an existing building,” says Mårten West, Business Area Manager at Nordec. “We are pleased to support HENT in realising this development in one of the northernmost urban areas in Europe.” 

The project continues Nordec’s involvement in construction projects in Northern Norway, where both urban constraints and local weather conditions set specific requirements. 

Tourism in Tromsø has been growing steadily, creating demand for additional accommodation. The Mack Øst hotel, located in the city centre, will provide approximately 350 rooms while preserving part of the city’s brewing heritage. 

The project will continue into 2026. 

For additional information, please contact: 

Minna Kuusela-Opas
Senior Vice President, Multi-storey
+358 (0)50 380 1734, minna.kuusela-opas@nordec.com  

Mårten West
Business Area Manager, Multi-storey Norway
+358 (0)40 174 0800, marten.west@nordec.com 

Read the press release here.

More about Nordec projects.

Season’s greetings from Nordec

READ MORE >

Nordec to deliver steel structures for the redevelopment of Modo Hockey’s training centre in Sweden

READ MORE >

Summer 2026 opportunities at Nordec

READ MORE >

Nordec delivers steel structures for Oulu’s new football stadium

READ MORE >

Nordec to deliver steel structures for Fazer’s new chocolate factory

READ MORE >

Verdion Södertälje Logistics Centre

READ MORE >

Welding training strengthens Nordec’s team in Peräseinäjoki

READ MORE >

Nordec responsible for structural frame for 11-storey hotel in Tromsø

READ MORE >

Summer in procurement at Nordec

READ MORE >

Nordec completes structural frame for Solar Sverige’s logistics centre in Kumla

READ MORE >

Practical design experience for summer trainees at Nordec

READ MORE >

Nordec to deliver steel-concrete structure for landmark Oslo Spektrumkvarteret project

READ MORE >

Nordec awarded contract for Jykia’ s Lastaustie 7 project in Jyväskylä

READ MORE >

Nordec’s 2024: Solid revenue and strong profitability driven by Sweden and industrial green transition projects

READ MORE >

Nordec to deliver frame and envelope for new train depot in Hagalund, Stockholm

READ MORE >

Safety at Nordec in 2024

READ MORE >

Resource-efficient steel structures built to perform

READ MORE >

Master’s thesis with Nordec: Improving subcontracting processes

READ MORE >

From trainee to sustainability trailblazer

READ MORE >

Commitment to safety: Nordec Poland

READ MORE >

From Trainee to Pro at Nordec

READ MORE >

Building a sustainable future: Nordec low carbon slim-floor beams

READ MORE >

Innovating with AI at Nordec in 2024

READ MORE >

Season’s Greetings from Nordec Team

READ MORE >

Commitment to safety: Nordec’s Ylivieska production plant

READ MORE >

Summer 2025 opportunities at Nordec

READ MORE >